References

 
<< < 1 2 3 4 5 6 7 8 9 10 11 12 13 > >>
 
 
System SCADA
Head 2,3m
Flow 7,5m3/s
VIDEO

The river is actually flowing slow as the river-bed is relatively wide. Necessary flow dynamics are ensured by the proper intake design. New Siapro Kaplan hydro-electricity power plant under construction in a new wooden machine house, wooden house is local district law. The price of the Kaplan hydroelectric power plant is determined for each project separately, as it is an individual designed project and realization made "turnkey".

 
 
 
 
Special material used for operation in salty water. VIDEO turbine in final operation
Characteristics:
Synchronous generator 350 kVA
Automation & protection system, SCADA
Head: H = 4,4 m
Flow: Q = 8.0 m3/s
Presentation in newsletter

 
 
 
Designing characteristics: P 270 kw / Hn 24. 5 m / Q 1.3 m3/s, high efficient Siapro turbine.  VIDEO turbine in final opretion
Siapro patented Crossflow hydro turbine with a structural change in closure for full use of the waterfall.

 
 
 
Pelton horizontal 4 nozzle and hydraulic equipment renovation

 
 
<< < 1 2 3 4 5 6 7 8 9 10 11 12 13 > >>
SIAPRO d.o.o.
Postaja 9
5216 MOST NA SOČI
Slovenia, EU

T: +386 5 3841 632
E: hydro@siapro.si
W: www.siapro.eu

More contacts

Follow us on

      

 
References
Small Hydro Jerala
Small Hydro Hobovščica
Small Hydro Žaga
Small Hydro in Serbia
Small Hydro Kavčič
Small HydroCerknica
Small Hydro Kogoj
Small Hydro in Africa
Small Hydro Hobovščica
Small Hydro Jerala