Siapro double regulated vertical Kaplan hydro power plant, automation and protection regulations, asynchronous generator 160 kW, installation in Europe, hydro power price is set individually


System SCADA
Head 2,3m
Flow 7,5m3/s
VIDEO

The river is actually flowing slow as the river-bed is relatively wide. Necessary flow dynamics are ensured by the proper intake design. New Siapro Kaplan hydro-electricity power plant under construction in a new wooden machine house, wooden house is local district law. The price of the Kaplan hydroelectric power plant is determined for each project separately, as it is an individual designed project and realization made "turnkey".


SIAPRO d.o.o.
Postaja 9
5216 MOST NA SOČI
Slovenia, EU

T: +386 5 3841 632
E: hydro@siapro.si
W: www.siapro.eu

More contacts

Follow us on

      

References
Small Hydro Hobovščica
Small HydroCerknica
Small Hydro Jerala
Small Hydro Kogoj
Small Hydro in Africa
Small Hydro Žaga
Small Hydro in Serbia
Small Hydro Hobovščica
Small Hydro Kavčič
Small Hydro Hobovščica