References

 
<< < 1 2 3 4 5 6 7 8 9 10 11 12 13 > >>
 
 
4 nozzles, 22 bars working pressure, proven high resistance materials, maintenance free needle guides and sealing, proportional control of hydraulic cylinders,
modular design with preassembling, fast installation; „plug & play“ – 3 days, glass window to the runner view, automatic filling system and startup, safety operation and shut down procedure

 
 
 
We successfully completed a new turnkey project where we took care of the modelling and construction
of equipment, production of equipment, necessary tests and final assembly at the final location of the new hydropower plant in Europe, Albania.

 
 
 
 
Siapro high quality manufacturing.
CNC machining of Pelton Runner D930x240

 
 
 
Hydro electricity plant in operation. VIDEO
Turbine power 929 kW
Net Head 122,5 m
5 Nozzles
Siapro modelling, manufacturing, pre-tested in Siapro workshop and final installation in Albania.

 
 
 
Siapro design, construction and manufacturing. Hydro Turbine ready to dispatch for installation in the country of East European Market. Pre-assembling of the generator on the turbine before the transport.

 
<< < 1 2 3 4 5 6 7 8 9 10 11 12 13 > >>
SIAPRO d.o.o.
Postaja 9
5216 MOST NA SOČI
Slovenia, EU

T: +386 5 3841 632
E: hydro@siapro.si
W: www.siapro.eu

More contacts

Follow us on

      

 
References
Small Hydro Žaga
Small Hydro in Serbia
Small Hydro Hobovščica
Small HydroCerknica
Small Hydro in Africa
Small Hydro Kogoj
Small Hydro Jerala
Small Hydro Hobovščica
Small Hydro Kavčič
Small Hydro Žaga